Building Eureka
We designed the building with our artsy lifestyle in mind from the ground up! Below are some photos from various projects. The basic structure was built in 2002 and we finally completed the interior of the building in 2013. We did a lot of the work ourselves but also worked in partnership with several local contractors.
Above photo: Local contractor Danny McAlister installing an interior door.
Dance Floor |
The main studio dance floor is moderately sprung using a basketweave technique. This softens the impact for dance and movement work in the space. We finished the floor using hard maple which is indigenous to New England. |
|
Upholstering |
We upholstered the studio using wide fabric so that the acoustics would be really warm and cozy! |
|
More to come! |
Check back soon to see more construction images.
|
 |